Tuesday, February 10, 2009

Sample Preparation for Compression Test

For the MH project EKS-92g and 127g batches were sintered earlier and they had to be prepared for the compression test. Since the clay content is somewhat higher the almost all the samples seem to be cracked. So I selected the samples carefully for preparation and cut them into 22.5 mm pieces which have to be reduced and smoothed to 20 mm according to the German standard.

Another kneading of Arg. body was done without fibers for five hours. The cleaning took about 3 hours as before and it is really a long and unhappy process since the two screws of the kneader can not be taken out of the machine. Reaching corners which have to be really cleaned was a painful process.

Monday, February 9, 2009

Interesting Result of Al2O3 project

Kneading of a clear body of Arg. was started in the morning without fibers.

Al2O3 fiber is not broken this time. So discussed with the supervisor and checked the fiber under the microscope. It could be seen that still the core has not removed completely but the burnt carbon is remaining. It is quite difficult to make sure whether carbon is there only as a layer or a solid part. Hence, the fiber will be examined under the light microscope and photographed.

Kneading was done for five hours and then the cleaning of the machine. It was very hard to clean the machine as usually happened last times. There was an idea to use MH material to do an over extrusion so that the whole part of Arg. body will come out. But this time only an abrasive liquid was used and it took about 3.30 hours to finish the cleaning.

Another sample was put to the furnace and this time the final temperature will be little bit higher maintaining the previous ramps.

Friday, February 6, 2009

Sieving Fibers

For Bgts samples the system was prepared and another sample was put in the water after equilibrium.

Sieving of the fibers of kneaded test samples were done and two batches were sieved. The separated fibers were dried and then put into small holders named.

Thursday, February 5, 2009

Kneading with the Big Kneader

A meeting was held to discuss about the further tasks that has to carried out regarding the projects.

The first thing is that the kneader has to be checked for the vacuum problem and identify the possibilities. Then also for the Arg. project, the test samples have to be sieved and separate the fibers to be checked under the microscope for the lengths.
Furthermore, the geometrical parameters of the 3rd bath of MH project has to be checked like density and shrinkage. And also the extrusion of modified 92g EKA-S 4mm fibers.

The kneader was checked and I could observe that the beading between the two lids of the main feeding has some openings which takes air inside in the vacuum condition. Kneading of the test sample of earlier kneadings were sieved to separate fibers.

The sample from the Brgts project, the earlier sample shows a weight loss. After the system became equilibrium, another sample was put in to water. The sample was kept five hours in hot water, taken out, dried using a tissue and kept for further drying in air.

Wednesday, February 4, 2009

Kneading with the Big Kneader

Since the cleaning of the big kneader takes about at least two hours the kneading was started early in the morning. Now it is with the same Arg. body and 8mm fibers and same as earlier the test samples had to be taken out at intervals. After 4 hours and 45 minutes, we tried to vacuum the device to make an extrusion of the kneaded material but the vacuuming seemed to be not working. Hence, the extrusion was stopped and cleaning started, it took about 3 hours to be finished.

For another project I had to give hand by doing a test on three samples. Each and every sample had to be placed in hot water of which the temperature had to be between 500 - 600 degrees. The beaker with water was placed on the electronic heater (electronic hotplate) and when the temperature was in equilibrium in between the mentioned temperature a sample (Tablet like) was carefully put into the middle using a tweezers. After five hours the samples had to be taken out and dried and weigh. The intention was to remove the binder which is dissoluble in water.
The weight of the first sample has reduced but it was kept to be dried more in air.

Tuesday, February 3, 2009

Kneading with Glass Fibers (small kneader)

Kneading of the Arg. body was started in the morning with glass fibers using the small kneader and it had to be kneaded for five hours and test samples had to be taken out after 30min and each and every hour. These samples will be sieved and fibers will be separated to observe the length of the kneaded glass fibers. Cleaning of this small kneader takes about 45 min to one hour.
The kneading has to be done using the big kneader so that it was cleaned off the oil and fixed for the next day use.
Al2O3 fibers still break up in the sintering process even this time another program was used. Now I am going to check whether the heating rate at the beginning has something to do with the fiber explosion.

Monday, February 2, 2009

Failure in the Sintering Process

As a sample of test sample 2 was put to the furnace CeramAix to sinter I looked at the results today in the morning. But there was no sample left on the Zirconia substrate. Probably the fiber is broken into pieces and blown away with the heat flow.

Since it is arguable about the inside flows which can break the structure of the fibers, the use of a crucible would be a good idea and I was provided with a crucible. Using it another sample was put to the furnace and this time it will go upto 14000C and sinter Al2O3.